Case Study : Gordon Bennett's Mills

By Jor Property Ltd, Aug 11 2018 06:35PM

JOR were called out to picturesque Gordon’s Mills overlooking the Bridge of Don. Liaising with the property owner above and the insurance company we programmed the necessary re-decorating work required to bring this property back into tip top condition.

BEFORE:

Split tape and hole in ceiling.

BEFORE:

Water damage shown running down walls and pooling on flat surfaces.

BEFORE:

Ceiling damage from above.

BEFORE:

Another burst tape and ceiling damage.

BEFORE:

Affected ceiling section removed and timbers checked.

BEFORE:

Affected pipe box area next to shower.

BEFORE:

Paint bubbling on kitchen ceiling.

BEFORE:

Kitchen ceiling tape burst.

BEFORE:

Kitchen ceiling bubbling and corner tapes affected.

BEFORE:

Damp also penetrated boiler cupboard ceiling.

BEFORE:

More paint bubbling on kitchen ceiling.

BEFORE:

Water escape affecting smoke detector and light fitting.

BEFORE:

Close up of hallway damage.

BEFORE:

Hallway tape burst.

BEFORE:

Hole punched in ceiling to prevent water from reaching light fitting.

DURING:

Neat rectangular ceiling area cut out ready for patching.

DURING:

Shower ceiling patched.

DURING:

First coat taped and plastered in hallway.

DURING:

First coat taped and plastered above vanity unit.

DURING:

All paint bubbles cut out, stain blocked and plastered in kitchen.

DURING:

Another aspect of kitchen ceiling repair.

DURING:

Boiler cupboard first coat taped and plastered.

DURING:

Kitchen - second coat flush plastered.

DURING:

Kitchen - second coat flush plastered.

DURING:

Boiler cupboard - second coat flush plastered.

DURING:

Bathroom - second coat flush plastered.

DURING:

Bathroom - second coat flush plastered.

DURING:

Hallway - second coat flush plastered.

DURING:

Hallway - second coat flush plastered.

DURING:

Kitchen - mist coat done.

DURING:

Kitchen 2nd aspect - mist coat done.

DURING:

Boiler Cupboard - mist coat done.

DURING:

Boiler Cupboard showing all floor protected as usual.

COMPLETE:

2nd and 3rd coat now complete in hallway.

COMPLETE:

Hallway aspect two.

COMPLETE:

Hallway aspect three.

COMPLETE:

Bathroom problem corner finished.

COMPLETE:

Bathroom problem corner aspect two.

COMPLETE:

The ceiling complete but problem bead to be dealt with.

COMPLETE:

Bead wedged in overnight.

COMPLETE:

Hey presto, the next day all has healed.

COMPLETE:

Bead fix complete and ceiling.