Case Study : From Airyhall to Airy House

By Jor Property Ltd, Jun 11 2018 10:20PM

As the weather improves it’s time to think about those changes you’ve always fancied to your home. To help plant the seed as to what kind of improvements you could do we’re looking at case study of a job we completed last summer. It was a full transformation including a rear extension, dormers, Velux installation and internal reconfiguration.


Before we have a look at the completed state here's what it looked like before...



BEFORE

Lounge


BEFORE

Dining Room


BEFORE

Lounge / Dining Room


BEFORE

Kitchen


BEFORE

The front of the house before conversion


ARCHITECTS PLANS

Showing the existing floor plans


ARCHITECTS PLANS

Showing the existing and proposed elevations


ARCHITECTS PLANS

Showing the proposed floor plans


ARCHITECTS PLANS

Showing the proposed sections


COMPLETE

Dormer extension and new bay window


COMPLETE

Existing hip joint repointed


COMPLETE

New bay window from inside


COMPLETE

Existing opening between living and dining area widened to create more of a flow. Flooring still to be confirmed.


COMPLETE

Previous fireplace and hearth removed. Awaiting clients decision on finish.


COMPLETE

Kitchen area with island unit jauntily angled towards sitting / garden area.


COMPLETE

A neutral pale cream flush unit with internal handles complimented by a limestone splash back.


COMPLETE

Rear extension full glazed vista with sliding doors allowing for access to the raised patio area.


COMPLETE

The aforementioned raised patio area.


COMPLETE

Rear dormer extended, full width extension on show.



COMPLETE

Garage access and harling detail with expansion beads fitted.


COMPLETE

New ground floor kitchen window installed on extension.


COMPLETE

Velux roof light installed in extension.


COMPLETE

Steel beam top right boxed and sheeted. Larger extraction fan fitted in a low key position above unit.


COMPLETE

Existing stairwell redecorated to match.


COMPLETE

Front dormer window extension.


COMPLETE

Rear existing dormer with new UPVC window.


COMPLETE

Upstairs bathroom now enlarged due to dormer extension. New frosted UPVC unit installed.


COMPLETE

Rear extension / beadwork / new garage roof tile detail.


COMPLETE

New boiler installation now situated to rear of the garage.


COMPLETE

Detail showing garage / gable wall double sheeted for insulation.


COMPLETE

Underfloor heating manifold detail.


COMPLETE

Underfloor heating manifold detail.